Industrial

Matrix Clothing

Location

Haryana

Year Completed

2021

Project Duration

6 months

Plant Specification

450 KW

Capacity

Rs. 52 LAKHS

Annual Savings

4.5 YEARS

Payback Period

675 Tonnes

CO₂ Saved / Year

How We Delivered

The Challenge

A major garment manufacturer in Haryana was absorbing significant grid electricity costs across its production operations  a competitive disadvantage in an export-oriented industry where margins are tight.

Our Solution

A 454 kW shed-roof solar plant, one of the larger industrial installations in the region, delivering power directly to the factory’s daytime electrical load across production operations.

The Impact

Approximately 6,60,000 units generated annually, equivalent to powering hundreds of homes driving down the per-unit cost of production in a meaningful way.

Why This Project Matters

“India's export-facing textile industry faces unrelenting global cost pressure. Solar power is increasingly a competitive tool, not just a sustainability gesture — and this installation proves it.”