Club House

⁠Gopalan lakefront community

Location

Bangalore

Year Completed

2025

Project Duration

3 months

Plant Specification

5 KW

Capacity

Rs. 65 THOUSAND

Annual Savings

3 YEARS

Payback Period

7 Tonnes

CO₂ Saved / Year

How We Delivered

The Challenge

A gated community wanted a solar plant to offset the power consumption of their common area clubhouse.

Our Solution

A 5KW solar plant mounted on the roof of the club house with ballast type structure for wind load stability.

The Impact

Annual generation of 7,000 units helping the community literally run the club house without additional power from the grid.

Why This Project Matters

“Gated residential communities can power common area loads with solar, reducing their overall costs and the need to go for higher sanctioned loads from the electricity department, thus reducing the burden on urban electrical infrastructure”