Corporate Organisation

Gopalan Fortune City

Location

Bangalore

Year Completed

2026

Project Duration

3 months

Plant Specification

200 KW

Capacity

Rs. 22 LAKHS

Annual Savings

4 YEARS

Payback Period

250 Tonnes

CO₂ Saved / Year

How We Delivered

The Challenge

Limited rooftop space, existing infrastructure, and high daytime electricity consumption required careful planning to maximise solar generation and ensure seamless net-metering integration.

Our Solution

A 200 kW rooftop solar plant with on-grid net metering was installed across the rooftop of a corporate building with high electricity consumption. With operations running throughout the week from 8 AM to 8 PM, the system is strategically designed to maximise the use of solar power during peak daytime working hours, helping reduce grid dependency and deliver significant energy cost savings.

 

The Impact

Reduced grid dependency, lower electricity costs, and maximised clean energy utilisation during peak operating hours, delivering long-term financial and environmental benefits.

Why This Project Matters

"Strengthening corporate sustainability through lower energy costs and greater energy resilience, turning sustainability commitments into measurable business value."

Have a similar requirement?

Our team has delivered projects across India — from compact residential systems to megawatt-class EPC installations.