Commercial Office

ETV 3A (Wells Fargo)

Location

Bangalore

Year Completed

2025

Project Duration

4 months

Plant Specification

200 LPD

Capacity

Rs. 10 LAKHS

Annual Savings

4 YEARS

Payback Period

150 Tonnes

CO₂ Saved / Year

How We Delivered

The Challenge

A commercial office campus in Bangalore sought to cut electricity costs and strengthen its sustainability credentials, with an installation that could be completed without disrupting day-to-day operations.

Our Solution

A 100 kW terrace-mounted solar system designed for minimal installation disruption, generating power during peak office hours to directly offset the building’s daytime electrical load.

The Impact

Measurable bill reductions from commissioning day, with the investment recovering in 5 years and the system generating free power for decades beyond.

Why This Project Matters

“Mid-sized commercial buildings often underestimate their rooftop potential. A 100 kW system is a straightforward, high-ROI entry point — and the 150 tonnes of CO₂ saved annually is no small number.”

Have a similar requirement?

Our team has delivered projects across India — from compact residential systems to megawatt-class EPC installations.