Industrial

Divine Titanium

Location

Mumbai

Year Completed

2026

Project Duration

2 months

Plant Specification

95 KW

Capacity

Rs. 15 LAKH

Annual Savings

3.5 YEARS

Payback Period

106 Tonnes

CO₂ Saved / Year

How We Delivered

The Challenge

High industrial energy consumption and the need to optimise available rooftop space while maintaining uninterrupted operations.

Our Solution

A customised rooftop solar system was engineered to maximise generation and integrate seamlessly with the facility’s existing electrical infrastructure.

The Impact

Reduced grid dependency, lowered energy costs, and transformed unused rooftop space into a long-term clean energy asset.

Why This Project Matters

"When energy is a major part of industrial operations, every unit saved strengthens the business making solar a strategic advantage, not just a sustainability choice."