Plotted Development

brigade oasis

Location

Bangalore

Year Completed

2025

Project Duration

4 months

Plant Specification

50 KW

Capacity

Rs. 8 LAKHS

Annual Savings

3 YEARS

Payback Period

75 Tonnes

CO₂ Saved / Year

How We Delivered

The Challenge

A plotted residential development required a solar plant to power their common area loads

Our Solution

A 50 KW solar plant mounted on their common area roof, ensuring power generation that powers common area lighting loads

The Impact

Annual generation of 73,000 units delivering reduction in running bills lower maintenance costs for the community.

Why This Project Matters

“Gated residential communities can power common area loads with solar, reducing their overall costs and the need to go for higher sanctioned loads from the electricity department, thus reducing the burden on urban electrical infrastructure.”