How We Delivered

The Challenge

A sensitive defence regiment barracks in a remote region of Assam required a reliable on-site power source to reduce dependence on the local grid and ensure readiness at all times.

Our Solution

A 135 kW grid-synchronised ground-mounted solar plant, engineered for structural stability in Assam’s climate conditions and designed to generate at least 1,97,000 units annually.

The Impact

Round-the-year solar power for critical functions within the barracks, enhancing operational readiness while reducing dependence on the grid in a location where reliability is non-negotiable.

Why This Project Matters

“Remote defence installations cannot afford power uncertainty. A solar plant that generates reliably 365 days a year is not just a cost-saving measure it is a strategic resilience asset.”