Industrial

AYM Syntex

Location

Silvassa

Year Completed

2025

Project Duration

4 months

Plant Specification

400 KW

Capacity

Rs. 40 LAKHS

Annual Savings

4 YEARS

Payback Period

600 Tonnes

CO₂ Saved / Year

How We Delivered

The Challenge

A textile manufacturing subsidiary with energy-intensive production processes was absorbing escalating electricity costs that were eroding operating margins in an already competitive industry.

Our Solution

A 400 kW rooftop solar plant across the factory’s shed roofs, engineered for structural stability on industrial roofing and optimised for consistent year-round generation.

The Impact

Close to 5,84,000 units of clean power generated annually, delivering direct bill savings that improve the plant’s cost competitiveness and operating profitability.

Why This Project Matters

“Manufacturing sectors dependent on grid power face a structural cost escalation risk. Rooftop solar turns the factory roof into a power station — cutting costs without cutting output.”

Have a similar requirement?

Our team has delivered projects across India — from compact residential systems to megawatt-class EPC installations.