Commercial Office

Embassy Hub/Phillips

Location

Bangalore

Year Completed

2025

Project Duration

6 months

Plant Specification

302 KW

Capacity

Rs. 34 LAKHS

Annual Savings

4 YEARS

Payback Period

450 Tonnes

CO₂ Saved / Year

How We Delivered

The Challenge

A flagship Embassy Group office campus in Bangalore needed a high-capacity solar installation to achieve green building certification and deliver material energy savings for a large tenant base.

Our Solution

A 302 kW rooftop solar plant on elevated structures, engineered for Bangalore’s wind conditions and designed to preserve functional roof access while maximising generation.

The Impact

Substantial annual power generation directly reducing the building’s grid dependence, accelerating the green rating journey and delivering long-term savings for the campus.

Why This Project Matters

“Flagship commercial assets that invest in large-scale solar set the tone for entire office precincts. Embassy Hub's commitment signals to tenants that sustainable workspaces are the new standard.”