India’s first one lakh five thousand litre installation for a leading client in automobile industry
Location
Chennai
Year Completed
2012
Project Duration
6 months
Plant Specification
1,05,000 LPD
Capacity
Rs. 45 LAKHS
Annual Savings
3 YEARS
Payback Period
400 Tonnes
CO₂ Saved / Year
How We Delivered
The Challenge
An automobile parts manufacturer was spending heavily on fossil fuel to heat water for degreasing and processing operations a direct drag on operating margins.
Our Solution
We engineered a custom solar thermal system that pre-heats process water to 90°C and feeds it directly into the client’s boiler, dramatically cutting the fuel needed to reach operating temperature.
The Impact
Fossil fuel consumption and costs fell significantly, while the shift to solar thermal improved the plant’s ESG credentials and sustainability reporting.
Why This Project Matters
“For India's manufacturing sector, solar thermal pre-heating is one of the most overlooked opportunities to cut costs. This project proves that process heat not just power is where the savings are.”
Have a similar requirement?
Our team has delivered projects across India — from compact residential systems to megawatt-class EPC installations.